Bozorov Shamsuddin Alomuddinovich
Annotation:
This article presents the optimization of the estimated cost of earthworks using the EXCEL program by selecting the parameters of the excavator operation based on the regulatory data. The analysis of labor intensity and cost of soil processing was carried out based on the results of the excavator with a bucket of 0,5 m3 . The study is based on the data of the ESR1-9-14 standards and includes labor intensity, machine time, and cost forecast. The initial data was structured and the impact of individual cost elements on the total cost was interpreted.
Keywords: labor intensity, analysis, cost, evaluation, optimization.